Description:
The non-fried instant noodles production line has biaxial elliptic blades with two kinds of speed, as to make more water can be added as well as materials and moisture and more evenly combined. Curing machine adopts double-pot technique to guarantee for the consistency of dough ripening. Noodle rolling machine used nine pairs of chilled alloy roll. Technology of flavor immersion is introduced after noodles are steamed.
SPECIFICATIONS FOR 3.5 TON CAPACITY
|
|||
Early part
|
Alkali mixing&measuring
|
Power: 0.75kw
Motor power: 1.5 KW*2
volume:1000L*2
|
the surface touched with the water is Stainless Steel
|
Double speed flour mixing machine
|
Motor power:6.5/9kw
|
400kg/batch,door opening by manual, the surface touched with flour is Stainless Steel
|
|
Steaming machine
|
200kg-400kg/sheet
|
W type/ U type/ Belt type
|
|
Main part
|
Pressing machine
|
Power: 5.5kw+5.5kw
|
7 pairs of steel roller, twin wheel device to adjust the thickness of flour sheet
|
Single layer steaming machine/cooking machine
|
Main driven :1.5kw
|
24 length, water airproof, Main drive 1.5kw (frequency conversion timing), fan 0.37 kw*2units, SS mechanism up and down opening, SS 304 for food touching parts.
|
|
Cutting& Dividing machine
|
Main driven 2.2kw
|
rise&fall2.2 kw,cyc pump 7.5kw, gear pump 2.2 kw,cutter 0.9 kw
|
|
End part
|
Cooling machine
|
Main driven 1.5 kw
|
blower 0.37 kw*8uits,exhaust fan 3kw
|
Abroad conveyor
|
Main driven
0.37 kw
|
Main drive 1.5kw(frequency conversion timing) SS304 panel
|
|
Electrical system
|
frequency conversion timing
|
PLC CONTROL
|
Main Features:
1. High quality instant noodle production line for making instant noodles 2. All machines are made of stainless steel, healthy and sanitary. 3. Square or round shape instant noodles can be made through this production line. 4. We provide line design, factory design, installation, commissioning etc.
Our Services:
1. Seller will send one engineer to Buyer's company to do installation and trail running and group training.The installation time would last about 10 days.